Car Barns & Outbuildings

Car Barns & Outbuildings

Car Barns & Outbuildings

As well as timber frame panels, SilvaFrame also designs and manufactures garden rooms, porches, car barns and other out buildings.


The above picture shows a garden room, from home office to man cave.

The barn pictured below features green oak beams and knee braces. 

Feature Trusses and Beams

SilvaFrame Structures can produce feature trusses in various materials and designs including Green Oak, Douglas Fir and Glulam. Other engineered products include glulam and steel encased beams, eco- and posi-joists.

Read More

Timber Frame Panels

Our panel products come as standard fitted with non-reflective membrane TF200 or TF200 thermo (reflective). Banding is then applied indicating the stud positions for fitting stainless steel brick ties or battening to receive the outer skin of your choice.

Read more

Find out more about the services offered by our partner company SC4 Carpenters Ltd.

Elstead, Surrey

Single storey timber frame extensions and outbuildings
For this timber frame project in Elstead, Surrey, SilvaFrame built and installed single storey timber frame extensions on existing properties, as well as car barns, bike stores and storage areas.

Read More

Jim & Yvonne Coombs' New 5 Bed Home

Rapid progress of timber frame enabled us to move into our wonderful new home within 10 months.

July 2015  

Winchcombe Cottage

After 40 years happily living in Winchcombe Cottage we realised the time had come for an upgrade.

After reviewing options we concluded that rebuilding was better than attempting repair. Used to living in a wooden house we were keen to accept a replacement based on modern, energy efficient, timber frame construction, such as that offered by SilvaFrame Structures in collaboration with SC4 Carpenters Ltd, who designed, project managed and built the house.

SC4 dealt with the design, planning consent and construction, carrying out timberframe erect, carpentry, roof tiling, kitchen and window fitting, as well as project managing demolition, ground works, mechancial and electrical, including photovoltaics and a pellet-based biomass boiler feeding under floor heating.

In spite of adverse winter weather that delayed completion of the groundworks, once started, the main timber frame structure was delivered and erected in just one day, and was waterproof within a matter of weeks, enabling rapid progress to be made on the interior.

We were able to move back in within 10 months of the demolition of the old house. Designed to fit the original footprint and keeping the main features, including basement and attic, we felt at home at once and continue to appreciate all the energy saving benefits.

SUBSCRIBE TO OUR NEWSLETTER

You will receive our latest promotions and news. Unsubscribe with one click.